|
|
||
|
POWER/CONNECTED LOAD VIS-A-VIS REQUIREMENT |
||||||||
| Sl. No. |
Name of the Section |
Motor and Other Electric Appliances |
Light/Fan/Plug Points |
|||||
| Old Building | New Building | Old Building | New Building | |||||
| 1 |
Electrical Engg Deptt. |
15 KW | 3 KW | 1 KW | 5 KW | |||
| 2 |
Workshop |
15 KW | 50 KW | 2 KW | 5 KW | |||
| 3 |
Mechanical Engg. Deptt. |
40 KW | 10 KW | 2 KW | - | |||
|
4 |
Metallurgical Engg. Deptt. |
- | 25 KW | - | 5 KW | |||
| 5 |
Drilling Engg. Deptt. |
- | - | 1 KW | - | |||
| 6 |
Mining Engineering Deptt. |
3 KW | - | 3 KW | - | |||
| 7 |
Mine Survey |
3 KW | - | 1 KW | - | |||
| 8 |
Geology Dept. |
- | - | 1 KW | - | |||
| 9 |
Math & Science Deptt. |
- | - | 2 KW | - | |||
| 10 |
Office Side |
2 KW | - | 2 KW | - | |||
| 11 |
Computer Lab (Ground Floor) |
3 KW | - | 2 KW | - | |||
| 12 |
Computer Lab (1st Floor) |
3 KW | - | 3 KW | - | |||
| 13 |
Library |
- | - | - | 1 KW | |||
| 14 |
LRUC Hall |
- | 4 KW | - | 2 KW | |||
| 15 |
Institution Class Room/ Verandah |
- | - | 5 KW | 5 KW | |||
| 16 |
Hostel (Old) |
- | - | 14 KW | 10 KW | |||
|
1.
Maximum
Demand per Day (10 AM TO 5PM.) =50 KW |
||||||||
|
2.
Minimum Demand per Day(10 AM TO 5PM.)
=25 KW. |
||||||||
| 3
Minimum
Demand per Day(10 PM TO 10 AM.)=15 KW |
||||||||